Auckland Hospital - AED and CED Entrance Expansion
Project Overview
Location:
New Zealand
Client:
Te Whatu Ora - Health New Zealand
Sector:
Public Healthcare
Completion:
2023

A fast-tracked prefab decant ward at Wellington Regional Hospital was designed and delivered through close collaboration and precise coordination. Using BIM technology, the design and construction teams worked efficiently to overcome site and timeline constraints.

The completed ward added 12 new beds, expanding hospital capacity while ensuring quality, safety, and seamless integration with existing facilities.

Addressing Capacity Challenges in AED

The entrance, screening, triage and waiting room area of the Adult Emergency Department (AED) was under pressure from COVID, winter illness, increasing patient volume and surges.

Addressing Capacity Challenges in AED

The entrance, screening, triage and waiting room area of the Adult Emergency Department (AED) was under pressure from COVID, winter illness, increasing patient volume and surges.

Addressing Capacity Challenges in AED

The entrance, screening, triage and waiting room area of the Adult Emergency Department (AED) was under pressure from COVID, winter illness, increasing patient volume and surges.

Addressing Capacity Challenges in AED

The entrance, screening, triage and waiting room area of the Adult Emergency Department (AED) was under pressure from COVID, winter illness, increasing patient volume and surges.

Addressing Capacity Challenges in AED

The entrance, screening, triage and waiting room area of the Adult Emergency Department (AED) was under pressure from COVID, winter illness, increasing patient volume and surges.

Expanding Emergency Facilities to Enhance Capacity and Safety

AED had no more space to create new rooms and the waiting area was too small to accommodate patients. The ongoing need to separate patients based on their risk-screening also meant that more than one waiting room was required. Work was required to expand AED and CED into the undercroft area, without compromising safety, and providing a necessary degree of comfort and a welcoming atmosphere.

Expanding Emergency Facilities to Enhance Capacity and Safety

AED had no more space to create new rooms and the waiting area was too small to accommodate patients. The ongoing need to separate patients based on their risk-screening also meant that more than one waiting room was required. Work was required to expand AED and CED into the undercroft area, without compromising safety, and providing a necessary degree of comfort and a welcoming atmosphere.

Expanding Emergency Facilities to Enhance Capacity and Safety

AED had no more space to create new rooms and the waiting area was too small to accommodate patients. The ongoing need to separate patients based on their risk-screening also meant that more than one waiting room was required. Work was required to expand AED and CED into the undercroft area, without compromising safety, and providing a necessary degree of comfort and a welcoming atmosphere.

Expanding Emergency Facilities to Enhance Capacity and Safety

AED had no more space to create new rooms and the waiting area was too small to accommodate patients. The ongoing need to separate patients based on their risk-screening also meant that more than one waiting room was required. Work was required to expand AED and CED into the undercroft area, without compromising safety, and providing a necessary degree of comfort and a welcoming atmosphere.

Expanding Emergency Facilities to Enhance Capacity and Safety

AED had no more space to create new rooms and the waiting area was too small to accommodate patients. The ongoing need to separate patients based on their risk-screening also meant that more than one waiting room was required. Work was required to expand AED and CED into the undercroft area, without compromising safety, and providing a necessary degree of comfort and a welcoming atmosphere.

Strategic Redesign of Screening and Triage Areas

To permanently close in the undercroft area, Neet Design had to relocate the screening and triage areas for walk-in patients, as well as create separate waiting areas based on screening, assessment rooms and facilities for both AED and CED. This meant consolidating staff as much as possible.

Strategic Redesign of Screening and Triage Areas

To permanently close in the undercroft area, Neet Design had to relocate the screening and triage areas for walk-in patients, as well as create separate waiting areas based on screening, assessment rooms and facilities for both AED and CED. This meant consolidating staff as much as possible.

Strategic Redesign of Screening and Triage Areas

To permanently close in the undercroft area, Neet Design had to relocate the screening and triage areas for walk-in patients, as well as create separate waiting areas based on screening, assessment rooms and facilities for both AED and CED. This meant consolidating staff as much as possible.

Strategic Redesign of Screening and Triage Areas

To permanently close in the undercroft area, Neet Design had to relocate the screening and triage areas for walk-in patients, as well as create separate waiting areas based on screening, assessment rooms and facilities for both AED and CED. This meant consolidating staff as much as possible.

Strategic Redesign of Screening and Triage Areas

To permanently close in the undercroft area, Neet Design had to relocate the screening and triage areas for walk-in patients, as well as create separate waiting areas based on screening, assessment rooms and facilities for both AED and CED. This meant consolidating staff as much as possible.

Other projects

Explore our other projects showcasing Neet Design’s diverse expertise across healthcare, commercial, and community spaces. Each project reflects our commitment to quality, functionality, and human-centered design — creating environments that not only meet practical needs but also inspire connection and wellbeing.

Committed to thoughtful Healthcare design.
Explore more Healthcare projects

Explore additional aged care environments crafted with the same focus on wellbeing, light, and functionality — designed to support both community living and individual comfort.

Thank You!
Your submission has been received!
Oops! Something went wrong while submitting the form.
Let's discuss

Ready to bring your vision to life? We'd love to hear about your project.

EMAIL

info@neetdesign.co.nz

PHONE

+64 21 029 88635

ADDRESS

Level 1, 17 Great South Road, Newmarket,
Auckland 1051 New Zealand

Auckland Hospital - AED and CED Entrance Expansion

A fast-tracked prefab decant ward at Wellington Regional Hospital was designed and delivered through close collaboration and precise coordination. Using BIM technology, the design and construction teams worked efficiently to overcome site and timeline constraints.

The completed ward added 12 new beds, expanding hospital capacity while ensuring quality, safety, and seamless integration with existing facilities.